The shop-floor Gantt — 18 jobs across 24 weeks
Phase bars by team; thin brass strip = surgical equipment install; ◇ target handover, ◆ forecast handover (orange link = slip). Dashed line = today, Wed 9 Sep 2026.
DesignConstructionEquipmentCloseoutSlip
Resource utilization — team × week
Booked hours ÷ weekly capacity. Green ≤ 100%, orange = over-allocated.
Booked vs capacity — hours per week
All teams, full window
BookedCapacity
Jobs ranked by margin at risk
Fee exposed to slip, rework and overtime · days to forecast handover
What this board answers
Three questions, answered from the same numbers
Ask the data
Natural-language layer over the same model (mock)
Which team is the bottleneck in Q4, and what happens if the Linear Accelerator Vault slides one week?
Static mock-up of the conversational layer. Answers cite the same measures as the visuals above.